environment

The U.S. Army to Detonate Explosives in Iowa, Potentially Producing Toxic Lead Dust

Published November 19, 2026 · 7 min read
The U.S. Environmental Protection Agency in Washington on Jan. 6, 2026.(Madalina Kilroy/The Epoch Times)

The United States Army is scheduled to detonate unstable explosives at a military ammunition plant in Iowa on Friday. This controlled detonation, set to take place at around noon Central Time in Middletown, may release lead dust into the atmosphere, which could then spread to eastern Iowa and northwestern Illinois, settling on agricultural fields, homes, playgrounds, and other outdoor surfaces. This raises significant concerns among local residents about potential environmental contamination and public health risks.

The Army plans to carry out the controlled explosion in two phases, dealing with a total of 68 barrels of lead azide, weighing approximately 9,700 pounds. Lead azide is a highly sensitive explosive that has been used for military munitions for many years. During long-term storage, this particular batch of material has degraded, increasing its sensitivity to friction and impact. Consequently, the military has determined that moving or transporting it could trigger an accidental detonation, making the decision to detonate it on-site necessary.

The Environmental Protection Agency (EPA) has indicated that the lead azide in question has undergone recrystallization during its prolonged storage, heightening the risks associated with its explosive potential. Justine Barati, a public affairs expert with the Army Sustainment Command, indicated that these barrels have been housed at the ammunition plant for over two decades, initially stored in a container buried under soil and immersed in a mixture of ethanol and water to maintain stability. However, an inspection earlier this year revealed that some of the moisture had evaporated, adversely affecting the stability of the material.

After evaluating various disposal options, the Army concluded that moving or transporting the materials presented an unacceptable risk of accidental detonation, even endangering the lives of explosive disposal personnel. Thus, the decision was made to proceed with a controlled detonation on-site.

Barati noted that cold weather conditions could further heighten the risk of accidental detonation. The military has expressed significant concern that these materials might explode spontaneously.

It is not common for the Army to carry out such operations near densely populated areas. The planned explosion is expected to generate substantial noise and ground vibrations, along with dust containing lead particles.

To mitigate the dispersion of dust, the Army has outlined protective measures, including earthworks, spraying water to dampen the soil, and setting up air monitoring equipment. According to reports, the barrels containing the explosives will be encased in concrete and buried underground, surrounded by sand barriers approximately two stories high. The military will also spray water on the soil and utilize air misting to contain the lead dust within the military facility’s boundaries.

Before the explosion, environmental sampling will be conducted, and during the detonation, air monitoring equipment will be in place. After the explosion, the environment within the blast radius will be sampled to assess the impact.

The Army’s dispersion model suggests that while the concentration of lead particles in the air may temporarily increase following the explosion, the predicted levels remain well below those requiring protective actions as outlined by the EPA.

However, this does not imply that there is no pollution risk whatsoever. The actual locations and quantities of lead dust deposition must be confirmed through environmental sampling conducted after the explosion, taking into account weather conditions at the time of the event.

Given the potential magnitude of the explosion, the Army has issued warnings that nearby structures could experience vibrations, perhaps causing old windows to shatter.

Residents living near City Park in Middletown have been advised to evacuate temporarily from 8 a.m. to 2 p.m. on Friday. Those unable to leave are instructed to remain indoors and close all doors and windows.

On November 15, the military issued a message to inform residents that they might experience loud noises, ground shaking, and visible dust clouds during the explosion. The Army anticipates that any dust in the air will not linger for more than an hour, although the specific duration will depend on wind conditions.

For those seeking temporary shelter, the Armed Forces Reserve Center in Middletown will be available, allowing residents to bring pets along.

Once the explosives are detonated, there is a possibility that lead dust could be carried by the wind and settle on the ground, leading to concerns about environmental contamination.

The Army has produced models predicting the spread of airborne lead dust and ground deposition. Preliminary projections indicate that dust may move northward across the Mississippi River into northwestern Illinois.

The Army has notified communities as far as 100 miles away from the blast site to alert residents to the potential impacts.

The Illinois Environmental Protection Agency (Illinois EPA) and the state’s public health department issued a joint statement on November 18, indicating that Mercer County in Illinois could be affected according to the Army’s current air dispersion model. As weather forecasts continue to evolve, other areas may also be at risk.

Illinois officials noted that while the Army has claimed to have arranged for extensive monitoring, they had yet to provide a comprehensive explanation to state officials about the specific scope and methods of this monitoring at the time of the announcement.

The Illinois EPA has called on the Pentagon to conduct comprehensive environmental testing in potentially affected areas after the explosion, including air, soil, and surface dust sampling, and to make the results public.

Lead is a neurotoxic heavy metal that does not degrade naturally. Once deposited on soil or surfaces, it may persist for long periods and can enter waterways through soil erosion or surface runoff.

The Centers for Disease Control and Prevention (CDC) has pointed out that a safe level of lead in the blood has not yet been established for children. Even low levels of lead exposure can adversely affect the development of children’s brains and nervous systems, leading to learning difficulties, developmental delays, and behavioral problems. Pregnant women and young children are especially vulnerable to the risks of lead exposure.

Experts in environmental and occupational health at the University of Iowa have indicated that it remains uncertain how much lead will enter the atmosphere due to the explosion and how much will eventually settle on the ground.

Therefore, the potential impact region as shown in the dispersion model does not imply that every location within it will experience harmful levels of lead contamination; actual sampling results remain crucial for determining the extent of the contamination.

The Army has advised residents who may be affected by the dust to minimize outdoor activities while the plume passes, remain indoors, and close doors and windows. If conditions allow, they may adjust heating and air conditioning systems to recirculate indoor air, reducing the influx of outdoor air.

After the military declares the exposure from airborne dust has ceased, residents should clean potentially contaminated surfaces with wet cloths, including windowsills, children’s toys, playground equipment, and patio furniture.

The Iowa Department of Agriculture has also urged residents to keep animals, hay, and drinking water indoors to mitigate the risk of lead dust contamination.

On November 13, the EPA’s Region 7 issued an emergency hazardous waste management permit, allowing the Army to store and detonate the lead azide on-site since the existing hazardous waste permit did not cover this location.

The EPA explained in a statement on November 16 that due to the increased sensitivity of the material to friction and impact after recrystallization, moving the containers posed a risk of accidental detonation, making emergency procedures necessary.

This emergency permit mandates the Army to conduct environmental monitoring before, during, and after the explosion, as well as publish predictions regarding dust dispersion.

The permit also stipulates that within 24 hours after the explosion, the Army must begin soil sampling and high-frequency surface wipe sampling at public parks, public facilities, and private land where access has been granted if predicted lead dust deposition reaches levels of 100 micrograms per square foot or higher.

The Army must submit a cleanup and remediation plan based on the monitoring results to the EPA. The permit also requires the Army to provide the EPA with a final impact area report within 30 days after the explosion, based on actual meteorological data at the time of the event.

On another note, the Iowa Department of Health and Human Services stated that it was only recently made aware of this detonation plan and is currently coordinating with other state and federal agencies to assess any potential public health issues that may arise.

At this time, the main concerns regarding this operation include: the extent of areas outside the military facility that may be affected by lead dust, whether environmental monitoring can adequately track contamination, and how the Army will ensure effective cleanup if lead deposits are detected.

Overall, the situation warrants close observation and ongoing communication with local communities to address concerns about health and safety.